Overview
- The Crown is an elite residential development in 6th of October City, spearheaded by Palm Hills Developments
- AMC acted as a dedicated BIM and Engineering consultant and contractor on the project
- Delivered highly coordinated engineering models and comprehensive documentation to drive construction efficiency and accuracy for this premium community
AMC’s Role
Multidisciplinary BIM Integration
- Executed complete integration of Architecture, Structure, and MEP (Mechanical, Electrical, and Plumbing)
- Applied unified BIM methodologies across all disciplines
- Conducted rigorous design verification to ensure full coordination
Clash-Free Construction Package
- Ensured every discipline was perfectly coordinated ahead of construction
- Delivered an optimized, clash-free construction package supporting efficient execution
Documentation & Consultancy
- Provided comprehensive documentation to support construction accuracy
- Acted as both consultant and contractor, combining design oversight with delivery accountability
Key Outcomes
Enhanced construction efficiency and accuracy through unified BIM coordination
Fully integrated Architecture + Structure + MEP BIM model
Clash-free, construction-ready package for a premium residential community
Architecture · Structure · MEP · Premium Residential From unified Architecture, Structure, and MEP BIM to rigorous design verification, AMC brings the same precision behind The Crown for Palm Hills Developments — a clash-free, construction-ready package built for premium communities.Planning a premium residential development?
