The Crown Palm Hills

Overview

  • The Crown is an elite residential development in 6th of October City, spearheaded by Palm Hills Developments
  • AMC acted as a dedicated BIM and Engineering consultant and contractor on the project
  • Delivered highly coordinated engineering models and comprehensive documentation to drive construction efficiency and accuracy for this premium community

AMC’s Role

Multidisciplinary BIM Integration

  • Executed complete integration of Architecture, Structure, and MEP (Mechanical, Electrical, and Plumbing)
  • Applied unified BIM methodologies across all disciplines
  • Conducted rigorous design verification to ensure full coordination

Clash-Free Construction Package

  • Ensured every discipline was perfectly coordinated ahead of construction
  • Delivered an optimized, clash-free construction package supporting efficient execution

Documentation & Consultancy

  • Provided comprehensive documentation to support construction accuracy
  • Acted as both consultant and contractor, combining design oversight with delivery accountability

Key Outcomes

Enhanced construction efficiency and accuracy through unified BIM coordination

Fully integrated Architecture + Structure + MEP BIM model

Clash-free, construction-ready package for a premium residential community

Architecture · Structure · MEP · Premium Residential

Planning a premium residential development?

From unified Architecture, Structure, and MEP BIM to rigorous design verification, AMC brings the same precision behind The Crown for Palm Hills Developments — a clash-free, construction-ready package built for premium communities.

ClientPalm Hills DevelopmentsYear2021Share
Go to Top
Contact Us