MEP drafting is the production work that turns engineering intent into the drawings a contractor installs from — modelling the mechanical, electrical and plumbing systems, coordinating them against structure and each other, and extracting plans, sections, riser diagrams, shop drawings and schedules from the result. It is also the part of an engineering workload that…
MEP Plans in Construction are the construction drawings that define how a building's mechanical, electrical and plumbing systems are sized, routed, installed and inspected. They are permit documents before they are coordination documents, and they are the reason a ceiling void either fits every service or forces someone to lower a soffit after the slab…
In any modern building, the same ductwork that delivers conditioned air can also become a hidden pathway for fire and smoke to spread between rooms and floors. HVAC fire dampers are the components that stop that from happening. As a critical part of a building’s passive fire protection — and of well-designed mechanical engineering services — these…
