Overview
- Part of the Diriyah Gate Project, located northwest of Riyadh and spanning over 7 km².
- Transforms the historic birthplace of the Kingdom into a premier cultural destination.
- Combines heritage-inspired architecture with hotels, museums, retail, and residences.
- Led by the Diriyah Gate Development Authority (DGDA).
AMC’s Role
High-Fidelity BIM for Critical Infrastructure
- Responsible for high-fidelity Building Information Modeling and spatial coordination across critical infrastructure and utility facilities within the Al Diriyah Gate Project.
- Delivered detailed 3D modeling from LOD 300 to LOD 400.
Multi-Package Coordination
- Provided multi-disciplinary coordination across four primary project packages: Fire Fighting, Irrigation, Tunnel Infrastructure, and Water Systems.
- Conducted constructability verification across each infrastructure package.
Constructability Verification
- Ensured technical accuracy and buildability across complex underground and utility infrastructure.
- Supported coordinated delivery of critical systems underpinning a 7 km² heritage development.
Key Outcomes in EL-DARYIA Project
- Coordinated infrastructure delivery supporting a landmark heritage destination.
- High-fidelity LOD 300–400 BIM across four critical infrastructure packages.
- Verified constructability for fire fighting, irrigation, tunnel, and water systems.
High-Fidelity BIM · LOD 300–400 · Critical Infrastructure From high-fidelity LOD 300–400 modeling to multi-package constructability verification, AMC brings the same precision behind EL-DARYIA — coordinated fire fighting, irrigation, tunnel, and water systems built to withstand scrutiny.Coordinating a critical infrastructure or utility package?