EL-DARYIA

Overview

  • Part of the Diriyah Gate Project, located northwest of Riyadh and spanning over 7 km².
  • Transforms the historic birthplace of the Kingdom into a premier cultural destination.
  • Combines heritage-inspired architecture with hotels, museums, retail, and residences.
  • Led by the Diriyah Gate Development Authority (DGDA).

AMC’s Role

High-Fidelity BIM for Critical Infrastructure

  • Responsible for high-fidelity Building Information Modeling and spatial coordination across critical infrastructure and utility facilities within the Al Diriyah Gate Project.
  • Delivered detailed 3D modeling from LOD 300 to LOD 400.

Multi-Package Coordination

  • Provided multi-disciplinary coordination across four primary project packages: Fire Fighting, Irrigation, Tunnel Infrastructure, and Water Systems.
  • Conducted constructability verification across each infrastructure package.

Constructability Verification

  • Ensured technical accuracy and buildability across complex underground and utility infrastructure.
  • Supported coordinated delivery of critical systems underpinning a 7 km² heritage development.


Key Outcomes in EL-DARYIA Project

  • Coordinated infrastructure delivery supporting a landmark heritage destination.
  • High-fidelity LOD 300–400 BIM across four critical infrastructure packages.
  • Verified constructability for fire fighting, irrigation, tunnel, and water systems.

High-Fidelity BIM · LOD 300–400 · Critical Infrastructure

Coordinating a critical infrastructure or utility package?

From high-fidelity LOD 300–400 modeling to multi-package constructability verification, AMC brings the same precision behind EL-DARYIA — coordinated fire fighting, irrigation, tunnel, and water systems built to withstand scrutiny.

ClientDiriyah Gate DevelopmentYear2024Share
Go to Top
Contact Us