Tahakom Facility Management Center

Overview

  • The Tahakom Facility Management Center is a comprehensive, state-of-the-art complex supporting extensive administrative, technical, and fleet operations
  • Integrates specialized zones including vast maintenance warehouses, data centers, and dedicated vitronic and battery rooms
  • Combines professional office departments with shared areas and technical facilities across 1,000+ m² of built-up area on the ground and first floors
  • Features a detailed parking and fleet operations program compliant with local codes and ADA accessibility standards

AMC’s Role

Value Engineering (Architectural, Electrical & Site)

  • Conducted a comprehensive BOQ and design review across architectural, electrical, and site-wide packages
  • Delivered value engineering solutions that optimized cost efficiency while preserving the original design intent
  • Identified and resolved discrepancies between BOQ quantities and model data, and proposed cost-effective material and system alternatives

Spatial Analysis & Area Planning

  • Delivered precise Built-Up Area (BUA) breakdowns across multiple floors for critical zones (communication rooms, data centers, external loading docks)
  • Ensured rigorous compliance with ADA standards and optimized fleet parking requirements for maximum operational flow

Detailed Architectural Documentation & Technical Design

  • Delivered a fully coordinated Detailed Design (DD) package at LOD 400–500, bridging conceptual intent with construction readiness
  • Produced comprehensive floor plans, elevations, sections, and technical specifications for interior finishes, furniture, wayfinding signage, vertical circulation, and Fire & Life Safety compliance

Architectural Visualization & Spatial Rendering

  • Produced high-fidelity, photorealistic renders of exterior and key interior zones to support design decisions and stakeholder approvals
  • Delivered a cinematic visualization package, including bird’s-eye aerial perspectives, aligned with the project’s operational standards

Key Outcomes of Tahakom Facility Management Center
project

  • Achieved a streamlined, high-performance design that maximized return on investment through comprehensive value engineering
  • Delivered a clash-free, construction-ready LOD 400–500 documentation package
  • Ensured full compliance with parking, ADA, and Fire & Life Safety requirements
  • Provided a complete visualization package supporting stakeholder alignment and design approval

Value Engineering · LOD 400–500 BIM · Facility Management Centers

Need to cut costs without cutting quality on a technical facility?

From BOQ-driven value engineering to a fully coordinated LOD 400–500 Detailed Design package, AMC brings the same precision behind the Tahakom Facility Management Center — streamlined costs, compliant design, and construction-ready documentation.

ClientClient nameYear2026AuthorAuthor nameShare

Leave a comment

Go to Top
Contact Us